This month we are focusing on a design build project. This project includes the removal of a creosote timber box retaining wall, removal of vegetation behind the wall, re-grading of the slope from edge of asphalt to edge of cleared area, installation of 2 man rock rockeries at existing utility vaults to protect against sloughing/erosion, installation of erosion controls, installation of drainage control systems, re-vegetation of the cleared slope area, cutting and capping existing remote fuel tank lines and tank power/control lines at the base of the existing retaining wall, removal and disposal of tank containment system, placement of a new 2500 gallon fuel tank, fencing, bollards, containment system, fuel lines, power lines, and control lines between B69 boiler(s) and the new 2500 gallon fuel tank. We plan to start construction mid-September.